For years, data centre sustainability reporting has been a largely voluntary, inconsistent affair. That era is ending. On 21 September 2026 the European Commission adopted a delegated regulation creating a mandatory sustainability rating scheme for data centres, and it changes what operators will have to be able to prove.
The direction of travel is simple to state. Reporting is moving from rough, voluntary, facility-level estimates towards standardised, comparable, mandatory figures that sit on a public label. The harder question is whether your estate can produce the evidence behind that label. For most operators today, the honest answer is not yet.
What the scheme actually requires
The scheme supplements the EU Energy Efficiency Directive and introduces an A to G sustainability label, the same familiar scale used on fridges and washing machines. It is mandatory for data centres with an installed IT power demand of at least 500 kW, which captures most enterprise and colocation facilities of any real size.
The label grades two headline measures: Power Usage Effectiveness (PUE) and Water Usage Effectiveness (WUE). Alongside those, it displays how energy is sourced, the facility's contribution to new energy capacity, its flexibility to the grid, and its readiness to reuse waste heat. The first labels for individual data centres are expected in 2027, with minimum energy performance standards expected to follow.
The gap the label exposes
Here is the problem. PUE and WUE describe the building. They tell you how much energy and water the facility uses around the IT. They tell you almost nothing about what the IT itself delivers for that energy, and in a well run estate the IT is 74 to 83% of total energy use.
So an operator can report a respectable PUE and still be running an estate full of over-provisioned or underperforming hardware. The label measures the wrapper, not the contents. As reporting tightens and regulators, customers and investors start comparing these grades directly, the operators who can only speak to facility-level numbers will struggle to tell a convincing story about efficiency, because the real story sits one level down, in the servers.
Why measured evidence per configuration matters
The thing most operators cannot produce today is measured evidence of what each server configuration actually delivers per unit of energy. That is very hard to generate retrospectively. You cannot reach back and measure how your estate performed last year if you were not capturing it, and a label based on a snapshot of a poorly understood estate is a weak foundation to build a compliance position on.
This is why the timing matters. The operators who begin measuring now, at the hardware level, will have a baseline and a track record by the time the labels land and the standards tighten. The ones who wait will be producing their first real evidence under pressure, to a deadline, with no history to show improvement against.
What to do before you are asked
Build the baseline before the label requires it. Measure what your estate actually does, at the level of the IT, grade every configuration on what it delivers per unit of energy, and you turn a looming compliance obligation into something you already have in hand. The reporting bar is rising either way. The choice is whether you meet it with evidence you have been gathering all along, or scramble to assemble it when the deadline arrives.
Interact measures what data centre hardware actually delivers, graded A+ to F, across more than 500 data centres. See how Interact Verify works.